Donggang Sewage Treatment Plant Phase III Expansion Project

Number of visits: Date:2014-01-13 12:09
Image

Project Name: Donggang Sewage Treatment Plant Stage 3 Expansion Project – Installation Turnkey Project  

 

Project Profile:

  Nantong Donggang sewage treatment plant is located in Yangjiang road, Gangzha District, covering a total area of ​​100 acres, which is mainly responsible for the sewage treatment in the north area of the city and Gangzha District. Recently, the daily treatment capacity of Donggang sewage treatment plant has reached 50,000 tons, in the overloaded state. It is known that: the proposed Donggang sewage treatment plant stage three expansion project is located in the north of the plant, covering a total area of ​​about 40 mu, which is planned to be fully completed in 2013.

Project Scale: 100,000 m3/d

Project Contents:

  Civil engineering; the procurement, installation, commissioning and warranty of all equipments; all the buildings (structures) and piping systems of the plant’s general plane, the supply and installation of cables and so on; the procurement, installation, commissioning and warranty of electrical system; the procurement, installation, commissioning and warranty of instrumentations and automatic control systems; the general contracting of the single machine commissioning and linkage commissioning of the sewage plant as well as personnel training.

 

 

TypeInfo: Sewage

Keywords for the information:

Pacific Water Treatment Engineering Co., Ltd. All rights reserved 苏ICP备08016215号 
technology:
nantong.300.cn   Returns the animation page 】     Tel:0513-85228660